Home › Sage Intacct Power BI › How it works
For Sage Intacct contractors

From month-end spreadsheets to one trusted view of every job

Most contractors on Sage Intacct still rebuild WIP by hand and argue about whose number is right. Here is how we fix that in three steps, each with a fixed price. Step 1 is free and takes two minutes.

No system access needed. The WIP check runs in your browser, so nothing is uploaded.

Where you end up
  • WIP, margin and billing by job and by project manager
  • Every number tied to your general ledger
  • Updated automatically during the day, not once a month
  • One view for leadership and the board
  • A data warehouse you own, in your own Azure tenant
Sound familiar?

If two of these are true, your reporting is costing more than you think

WIP is rebuilt by hand every month

By the time over/under billing is ready, the month is over and it is too late to bill differently.

Your systems don't talk to each other

Job cost in Sage Intacct, project data in Procore or the field, labor in payroll, and everything else in spreadsheets.

Meetings start with "whose number is right?"

Finance, operations and project managers each bring a different version, and every copy-paste adds errors.

Leadership can't see results by job or PM

Executives and the board get a monthly summary instead of margin, billing and change orders by job and project manager.

None of this needs a new ERP. It needs one data layer underneath the systems you already have. Here is how we build it.

How it works

Three steps. A fixed price for each. You decide after every one.

Start here
1

Free WIP check

Free
2 minutes · no call needed

Paste or upload your job list. You instantly see over/under billing, earned revenue and margin fade by job, including the under-billing a portfolio total hides.

You get
  • An Excel WIP schedule with the formulas built in
  • A one-page PDF summary
Check your WIP free →
2

Business Intelligence Blueprint

$7,500 fixed
3–4 weeks · fee applied to your build within 60 days

We agree on what leadership needs to see, then prove it on your own data before you commit to a build.

You get
  • Company goals and the decisions behind them
  • KPI definitions, each with an owner
  • A map of your systems and business logic
  • Gap analysis: what your data can and can't answer today
  • A prototype dashboard on your own data
  • A roadmap with a fixed build price
How the Blueprint works →
3

Integration, data warehouse and Power BI

From $25K
Typically $25K–$60K · 8–12 weeks

We connect up to two systems, such as Sage Intacct and Procore, to a data warehouse in your own Azure tenant and build up to three Power BI dashboards on top. Every number is checked against your own reports before it ships.

You get
  • Automated data integration
  • A data warehouse you own
  • Up to three dashboards with role-based access
  • Training and documentation
Talk through a build →
What leadership sees

The page leadership opens first

The total says the portfolio is $80,000 over-billed, which looks fine. Job by job, $400,000 is under-billed on two jobs, and the retail center has lost six points of margin since it was bid. That is the difference between a monthly summary and a WIP dashboard.

WIP & Margin · All jobs
Sage Intacct + Procore · refreshed 10:42 AM
Project manager: All â–¾Region: All â–¾Period: Oct 2026 â–¾
Contract value$33.2M5 active jobs
Earned to date$20.47M62% complete
Billed to date$20.55MLeft to bill $12.65M
Net over / (under)+$80KLooks fine in total
âš  Under-billed$400K2 jobs: earned, not invoiced
Over / (under) billing by job
Left of the line: earned but not yet billed
Under-billedOver-billed
Medical clinic: ($250K)Medical clinic($250K)Distribution warehouse: ($150K)Distribution warehouse($150K)Retail center: $0Retail center$0Office interior build-out: +$180KOffice interior build-out+$180KSchool renovation: +$300KSchool renovation+$300K
Gross margin: bid vs. current estimate
Points of margin lost since the job was bid
At bidCurrent estimateFaded 2+ pts
6%8%10%12%14%16%Retail center: bid 14.0%, now 8.0%Retail center−6.0 ptsSchool renovation: bid 12.5%, now 10.0%School renovation−2.5 ptsMedical clinic: bid 14.1%, now 12.0%Medical clinic−2.1 ptsOffice interior build-out: bid 11.9%, now 10.0%Office interior build-out−1.9 ptsDistribution warehouse: bid 10.0%, now 10.0%Distribution warehouse0.0 pts
Jobs needing attention
Job% completeEarnedBilledOver / (under)GP % bid → nowStatus
Medical clinic40%$3.40M$3.15M($250K)14.1% → 12.0%Under-billedMargin −2.1
Distribution warehouse90%$10.80M$10.65M($150K)10.0% → 10.0%Under-billed
Retail center90%$2.25M$2.25M$014.0% → 8.0%Margin −6.0
School renovation25%$1.50M$1.80M+$300K12.5% → 10.0%Over-billedMargin −2.5
Office interior build-out60%$2.52M$2.70M+$180K11.9% → 10.0%On track
Total62%$20.47M$20.55M+$80K12.0% → 10.4%
Example figures. In the live dashboard every number drills through to the transactions behind it, and each project manager sees only their own jobs.
What changes

Before and after, for finance and operations

BeforeAfter
WIP scheduleRebuilt by hand after every closeUpdated automatically during the day
Where numbers come fromSeveral systems and spreadsheetsOne data warehouse, tied to the general ledger
Month-end reportingDays of copy-pasteRefreshes on its own
Leadership and board viewA monthly summaryMargin, billing and change orders by job and PM
MeetingsArguing about whose number is rightDeciding what to do about the jobs
OwnershipSpreadsheets on one person's desktopWarehouse and model in your own tenant
Questions

Common questions

Do we have to replace Sage Intacct or Procore?

No. We build underneath the systems you already use and read from them. Nothing is written back into your ERP.

Do you need access to our systems to get started?

No. The WIP check runs in your browser and the assessment is a conversation. The Blueprint prototype can run on exports your controller sends us. Any system access later is read-only.

What does the $25K build include?

Up to two source systems, the data warehouse and up to three Power BI dashboards, with training and documentation. Larger scopes are priced in the Blueprint. Azure (typically $50–$200 a month) and any connector licenses are paid directly to Microsoft or the vendor, not to us.

How long until we see something real?

The Blueprint ends with a prototype on your own data in 3–4 weeks. A build typically takes 8–12 weeks.

Next step

Start with the two-minute WIP check

See where every job stands before you talk to anyone. Prefer to talk first? Book a free 30-minute assessment and get a one-page summary of what to fix first within 48 hours.