Most contractors on Sage Intacct still rebuild WIP by hand and argue about whose number is right. Here is how we fix that in three steps, each with a fixed price. Step 1 is free and takes two minutes.
No system access needed. The WIP check runs in your browser, so nothing is uploaded.
By the time over/under billing is ready, the month is over and it is too late to bill differently.
Job cost in Sage Intacct, project data in Procore or the field, labor in payroll, and everything else in spreadsheets.
Finance, operations and project managers each bring a different version, and every copy-paste adds errors.
Executives and the board get a monthly summary instead of margin, billing and change orders by job and project manager.
None of this needs a new ERP. It needs one data layer underneath the systems you already have. Here is how we build it.
Paste or upload your job list. You instantly see over/under billing, earned revenue and margin fade by job, including the under-billing a portfolio total hides.
We agree on what leadership needs to see, then prove it on your own data before you commit to a build.
We connect up to two systems, such as Sage Intacct and Procore, to a data warehouse in your own Azure tenant and build up to three Power BI dashboards on top. Every number is checked against your own reports before it ships.
The total says the portfolio is $80,000 over-billed, which looks fine. Job by job, $400,000 is under-billed on two jobs, and the retail center has lost six points of margin since it was bid. That is the difference between a monthly summary and a WIP dashboard.
| Job | % complete | Earned | Billed | Over / (under) | GP % bid → now | Status |
|---|---|---|---|---|---|---|
| Medical clinic | 40% | $3.40M | $3.15M | ($250K) | 14.1% → 12.0% | Under-billedMargin −2.1 |
| Distribution warehouse | 90% | $10.80M | $10.65M | ($150K) | 10.0% → 10.0% | Under-billed |
| Retail center | 90% | $2.25M | $2.25M | $0 | 14.0% → 8.0% | Margin −6.0 |
| School renovation | 25% | $1.50M | $1.80M | +$300K | 12.5% → 10.0% | Over-billedMargin −2.5 |
| Office interior build-out | 60% | $2.52M | $2.70M | +$180K | 11.9% → 10.0% | On track |
| Total | 62% | $20.47M | $20.55M | +$80K | 12.0% → 10.4% |
| Before | After | |
|---|---|---|
| WIP schedule | Rebuilt by hand after every close | Updated automatically during the day |
| Where numbers come from | Several systems and spreadsheets | One data warehouse, tied to the general ledger |
| Month-end reporting | Days of copy-paste | Refreshes on its own |
| Leadership and board view | A monthly summary | Margin, billing and change orders by job and PM |
| Meetings | Arguing about whose number is right | Deciding what to do about the jobs |
| Ownership | Spreadsheets on one person's desktop | Warehouse and model in your own tenant |
Saved a year for a $100M general contractor by bringing claims from Excel, Primavera P6 and Sage 300 CRE into one Power BI dashboard.
Read the case study →Dashboard adoption at 30 days for a fast-growing financial organization that replaced manual reconciliation with real-time CFO dashboards.
Read the case study →No. We build underneath the systems you already use and read from them. Nothing is written back into your ERP.
No. The WIP check runs in your browser and the assessment is a conversation. The Blueprint prototype can run on exports your controller sends us. Any system access later is read-only.
Up to two source systems, the data warehouse and up to three Power BI dashboards, with training and documentation. Larger scopes are priced in the Blueprint. Azure (typically $50–$200 a month) and any connector licenses are paid directly to Microsoft or the vendor, not to us.
The Blueprint ends with a prototype on your own data in 3–4 weeks. A build typically takes 8–12 weeks.
See where every job stands before you talk to anyone. Prefer to talk first? Book a free 30-minute assessment and get a one-page summary of what to fix first within 48 hours.